Construction of the pipeline aimed at the development of engineering infrastructure of SEZ RL IPT «Terbuny», as well as the entire municipal district. The project envisages construction of a pipeline made of electric welding steel pipes d= 325x6 mm with extruded polyethylene insulation based on GOST 9.602-2005 gasrecusations and d= 108x4 mm with length of 7 m - 4 m. This diameter will provide the power claimed and intended by users. Incut of pipeline will be implemented into existing high-pressure gas pipeline.
  Main characteristics of the project  
| Investment volume: | 32,0 mln.rb. | |
| Realization term: | 3 | months |
| Offered cooperation forms: |   | state-private partnership |
  Initiator of the project  
| Organization: |   | JSC «Special economic zones of regional level» |
| Address: |   | 398016, Lipetsk, Popova Per., 5 |
 Contact 
| Name: |   | Mr. Narolin Alexander Mikhajlovich |
| Telephone |   | (4742) 35-51-55 |
| Fax: |   | (4742) 35-57-24 |
| E-mail: |   | info@oezru.ru |









